|
|
We need to have our shower hot mopped. The bottom is about 3 Feet by 6 Feet.
You have to:
1) Remove the tile on the floor
2) Hot Mop the floor of shower
3) Re-tile the shower floor.
We Will Provide the tile.
Please email me with your best price. I will call you if your price is the best.
|
It is ok to contact this poster with commercial interests.
Tags: I need to HOT MOP my shower. (Los Angeles)
|
|